aPlanner - AI-Powered Production Planning

aPlanner - AI 기반 생산계획 솔루션

Plan Smarter. Produce Faster.

An AI production-planning engine built for semiconductor complexity: yield-aware, constraint-based and scenario-driven. Four AI modules, one planning engine, designed to cut master-planning cycles from days to hours and to run inside the fab network.

Target 80%
Faster planning cycle (days → hours)
Target 85–90%
Forecast accuracy (+20–30 pts vs. Excel)
Target 95%
Faster scenario analysis
Target 99%+
Feasible plans, all constraints

Design targets from simulation on synthetic fab data; no customer deployments yet.

THE CHALLENGE

The world’s most advanced fabs plan in spreadsheets

When a machine goes down or a hyperscaler doubles its order, a planner needs a new plan in hours. Today it takes days, in Excel, with numbers nobody fully trusts. Industry estimates put the cost at US$100M+ a year per large fab in over-/under-production, missed demand and excess inventory.

Spreadsheet-based planning

3–5 days per master-planning cycle; plans are outdated before they are finished

Inaccurate demand forecasts

55–65% forecast accuracy with Excel; AI / data-center orders swing 30%+ in a quarter

Manual constraint management

~70% of schedules need manual fixes; knowledge lives in planners’ heads

No scenario analysis

A what-if takes days, so planners test 1–2 options and decide by gut feel

Disconnected systems

Data siloed in MES, ERP and spreadsheets; management sees yesterday’s numbers

Reactive firefighting

~70% of planner time spent gathering data and handling exceptions, not strategy

Why it is so hard in semiconductors

50–100+ process steps
3–6 month cycle times
±10–15% weekly yield swings
Continuous node migrations (176L → 236L → 300L+)
Hundreds of SKUs from one wafer (bin allocation)
AI / data-center demand swings of 30%+
THE SOLUTION

AI-powered planning in hours, not days

aPlanner replaces spreadsheets and gut feel with AI that forecasts demand, optimizes schedules across all constraints simultaneously, and lets planners test every decision before they make it. Each module is a replacement for a spreadsheet, not a dashboard on top of one.

Target performance — MVP under validation (2026)

Design targets, not measured results
MetricExcel-based planning todayaPlanner (target)Target improvement
Planning cycle3–5 daysTarget: < 30 min full-fab schedule
Target 80% faster
Forecast accuracy55–65% (Excel)Target: 85–90%
Target +20–30 pts
Scenario analysisDays per scenarioTarget: minutes per scenario
Target 95% faster
Schedule feasibility~70% (needs manual fixes)Target: 99%+ (all constraints)
Target near-perfect
Planner time on strategy~20%Target: 60%
Target 3x more
Data freshnessYesterday’s dataTarget: one live source of truth
Always current

Design targets from simulation on synthetic fab data; no customer deployments yet. Baseline figures are industry estimates for Excel-based fab planning.

CORE CAPABILITIES

Four AI modules, one planning engine

Forecasting tells the fab what the market will want; scheduling turns that into a feasible, yield-aware plan; simulation lets planners test every decision before they make it; analytics keeps everyone on the same live numbers.

Module 1

AI Demand Forecasting

What it is

Ensemble ML (LSTM, Prophet, XGBoost, Transformer) forecasting demand per bit-density tier / SKU, 1 day to 24 months, with confidence intervals. The best model per segment is chosen automatically and retrained as data arrives.

What problem it solves

Excel forecasts reach 55–65% accuracy, which means over- or under-production worth US$20–50M a year per large fab. AI / data-center orders swing 30%+ in a quarter.

What benefit it brings (target)

Target 85–90% accuracy (+20–30 pts); less inventory in the wrong place; demand sensing that catches hyperscaler swings weeks earlier.

Module 2

Intelligent Scheduling

What it is

Constraint-based optimizer across tools, materials, labor, maintenance and changeovers, yield-aware over 50–100+ wafer steps, with automatic re-planning on disruptions.

What problem it solves

3–5-day manual cycles; ~70% of schedules need manual fixes; plans are outdated before they are finished; knowledge stays in planners’ heads.

What benefit it brings (target)

Target full-fab schedule in under 30 minutes (80% faster); target 99%+ feasible plans; bin-sort allocation that maximizes revenue per wafer.

Module 3

Scenario Simulation

What it is

Monte-Carlo what-if engine with templates (tool down, +20% hyperscaler order, yield −10%, node migration), side-by-side KPI comparison and an AI-recommended plan.

What problem it solves

A scenario takes days in Excel, so planners test 1–2 options and decide by gut feel: an estimated US$15–25M a year of sub-optimal decisions per large fab.

What benefit it brings (target)

Target minutes per scenario (95% faster); unlimited scenarios; quantified risk; decisions the whole team can defend.

Module 4

Real-Time Analytics

What it is

Live planning KPIs (adherence, OTD, WIP, utilization), anomaly detection and explainable recommendations, with Korean / English planner and executive views.

What problem it solves

Data siloed in MES, ERP and spreadsheets; planners spend ~70% of their time gathering it; management sees yesterday’s numbers.

What benefit it brings (target)

One always-current source of truth; target planner time on strategy from 20% to 60%; every recommendation auditable.

INNOVATION

Yield-aware, scenario-driven scheduling for multi-step wafer processes

The novelty is in combining three things that today live in three different heads: yield, constraints and scenarios.

Yield-aware constraint scheduling

What it is

The optimizer takes live yield and bin distributions per process step as inputs, so wafer starts, expected good die and bin mix are planned together across 50–100+ steps, instead of scheduling starts and hoping the yield follows.

Advantages

Plans that survive ±10–15% weekly yield swings; fewer wafer starts for the same output (target 5–15% yield-adjusted gain); bin allocation that maximizes revenue per wafer. No incumbent APS models yield inside the schedule.

KIPO patent application planned Dec 2026

Node-migration planning

What it is

Models learning curves, ramp rates and capacity shifts when a line moves 176L → 236L → 300L+, planning old and new nodes as one system with shared tools and demand.

Advantages

Smooth transitions without demand gaps; customer commitments protected during the ramp; capacity decisions visible months earlier. Generic tools treat a new node as just a new product.

KIPO patent application planned Q1 2027

Explainable re-planning

What it is

Every schedule change carries the triggering event, the constraints it hit and the KPI delta; the planner approves, edits or rejects in Korean or English.

Advantages

Adoption in conservative fab planning cultures; auditability for management and quality; planners keep control while tribal knowledge moves from heads into the system.

Korean UI + planner-approval workflow (MVP)
DEVELOPMENT STAGE

Where aPlanner is today

Not commercialized; no revenue; no customers yet. Working prototypes of scheduling, simulation and analytics on synthetic fab data; forecasting engine prototyped, dedicated view in the December 2026 build. All are being validated ahead of the 2027 Korean pilot program.

Done

Phase 1 — Foundation

Apr–Jun 2026

Done — working prototypes on synthetic fab data

Phase 2 — Concept

Jul–Sep 2026

Now

Phase 3 — Validate

Oct–Dec 2026

Next

Phase 4 — Launch prep

Jan–Mar 2027

WHY EXISTING TOOLS DO NOT SOLVE IT

Legacy APS is generic, slow and bolted-on AI

Incumbent planning suites were not designed for yield curves and node transitions, and the AI-first vendors are built for consumer supply chains. aPlanner column shows design targets.

SAP IBP / Oracle APSKinaxis / o9 / Blue YonderaPlanner (target)
AIBolt-onPartial / genericAI-native
Semiconductor depthGenericAutomotive / supply-chain focusNAND- / fab-specific models
Deployment12–18 months4–12 monthsTarget 8–12 weeks
Scenario speedHours–daysHoursTarget minutes
Entry priceUS$400–500K+/yrUS$250–300K+/yrKRW 120–300M/yr (≈ US$100–250K)
Korean-fab data residencyCloud-firstCloud-firstOn-prem / private cloud option
KOREA

Built for Korean fabs

Korean fabs ask three questions first: where is my data, does it talk to my MES, and who answers the phone in Korean? aPlanner is designed to answer all three, with KRW contracts from a Korean company (Amoza Korea Co., Ltd., incorporating 2027).

Data stays in the fab

On-premise or private cloud inside the fab network, with an air-gapped option. Read-only connectors first; no production data leaves the site. SaaS on AWS Seoul for suppliers and SMEs.

Korean systems landscape

Pre-built connectors for in-house MES, SAP ERP, yield / bin databases and planner spreadsheets (in development). Write-back of approved plans only after sign-off. Korean SI / MES partners for delivery.

Korean users, Korean support

Korean UI, reports and planner-approval workflow. Korean hires in 2027 (planning domain, MES integration, business development). Founder and support within an hour of the Yongin–Pyeongtaek cluster.

Security & governance

Role-based access, SSO, full audit trail; AI recommends, people decide. Roadmap: SOC 2 Type II (2027–28), ISO 27001 (2028), K-ISMS (planned). No certification is held today.

Editions (Korea, annual, KRW)

EditionAnnualFor
StarterKRW 120–300M / yr (≈ US$100–250K) Single site, core AI (forecasting, scheduling, basic scenarios)
ProfessionalKRW 400M–1B / yr Multi-site, MES + ERP connectors, Monte-Carlo simulation
EnterpriseKRW 1B–2.5B+ / yr Global optimization, custom models, 24×7 support

Services

Planning Readiness Assessment
KRW 50–100M
Implementation (8–12-week pilot → rollout)
KRW 100–400M
AI model tuning
KRW 50–150M
Support & managed services
15–20% of subscription / yr

Indicative pricing for the 2027 Korea pilot program and first subscriptions. See pricing

PILOT PROGRAM 2027

From readiness assessment to subscription

Land with one line, prove the plan against yours, then expand. Designed for Korean memory fabs, tier-1/2 suppliers and OSATs, and high-mix electronics, display and battery plants.

1

Paid Planning Readiness Assessment

Data inventory (MES, ERP, yield / bin DB, spreadsheets), planning-process mapping and a quantified value hypothesis for your site. KRW 50–100M, 3–4 weeks.

2

8–12-week pilot on one production line

aPlanner deployed on-prem or in a private cloud against one line’s real data, read-only connectors first. Target KPIs agreed up front and measured side by side with the current plan. KRW 75–150M.

3

Starter subscription

Convert the pilot into a Starter subscription for the site, then expand to multi-site Professional and, as the MAKE roadmap matures, aMonitor.

ECOSYSTEM — ROADMAP

aPlanner is the starting point, not the destination

Planning leads to monitoring (aMonitor), and planning plus monitoring on one AI platform becomes a complete Smart Factory. The products below are roadmap; today we build aPlanner.

Become a design partner in 2027

We are looking for a small number of Korean fabs and suppliers to pilot aPlanner on one production line: paid readiness assessment, 8–12-week pilot, then a Starter subscription.